Allowed

Yes, solar panels are permitted in Memphis, TN. A permit is required.

Solar panel installation in Memphis, TN is permitted and, for new construction, often required by state mandate. Residential solar installations require a building/electrical permit from the local building department. Contact the building department for the current permit process.

Solar Panels Rules in Memphis

Solar Panel Rules in Memphis: Permit required: Yes — all solar installations require a permit.

Costs & Fees

Solar permit fees in Memphis: Contact the local building department through their official website for current fee schedule.

Next Steps

Next steps for installing solar panels in Memphis: 1. Get quotes from licensed solar installers familiar with TN requirements. 2. Installer will prepare permit application and system design documents. 3. Permit application submitted to the local building department. 4. Once permit approved, installation begins. Electrical inspection required at completion. 5. Apply for utility interconnection and net metering through your utility provider.

Memphis Division of Planning and Development

Frequently Asked Questions

How does Memphis planning differ from Nashville's consolidated metro government?

Memphis and Shelby County have a coordinated but not fully consolidated planning structure. The Memphis and Shelby County Division of Planning and Development handles planning for both the city and county through a shared Unified Development Code (UDC), but Memphis and Shelby County remain separate governments with separate taxation and services. Nashville (Metro Nashville-Davidson County) is a fully consolidated city-county government. For permitting purposes in Memphis city limits, you work with the Memphis Division of Planning and Development.

Can I build an ADU on my Memphis property?

Yes. Memphis allows accessory dwelling units under the Memphis and Shelby County Unified Development Code. Maximum size is typically 900 sqft in standard residential zones. You'll need a building permit from the Division of Planning and Development. Tennessee has no statewide ADU law — Memphis rules govern. No owner-occupancy requirement. MLGW connection fees apply if the ADU has independent utility service.

What is MLGW and how does it affect permits?

MLGW (Memphis Light, Gas, and Water) is a combined municipal utility providing electricity, natural gas, and water service to Memphis and surrounding areas. It is one of the few remaining combined utilities in the US. For solar installations, MLGW interconnection is required. MLGW distributes TVA power — TVA's Green Power Providers program governs net metering-equivalent credits. For new construction or ADUs, MLGW connection fees apply.

Are there historic preservation requirements in my Memphis neighborhood?

Memphis has significant historic resources including Beale Street (blues heritage), Victorian Village, and several Midtown neighborhoods. If your property is a contributing structure in a designated historic district, the Memphis Landmarks Commission may require a Certificate of Appropriateness for exterior modifications. Check the Division of Planning and Development website or contact them to determine your property's historic status.

Is Memphis in a flood zone?

Many Memphis properties near the Mississippi River and Wolf River are in FEMA-designated Special Flood Hazard Areas. The 2011 Mississippi River flood reached record levels in Memphis. Check the FEMA Flood Map Service Center (msc.fema.gov) for your property's designation. Properties in SFHA require flood insurance with federally-backed mortgages. Contact the Memphis stormwater management program for more information.

Source: Memphis Division of Planning and Development — Building Regulations. Last verified April 6, 2026. View source