Can I Build?

Can I Build Second Story Addition in Portland, OR? (2026)

Find out if you can build a second story addition in Portland, OR. Rules, permit requirements, costs, and next steps.

Conditional

Adding a second story in Portland, OR is possible in most zones, subject to height limits and structural permit requirements.

A second story addition is one of the most complex home improvement projects in Portland, OR. It requires a full building permit, structural engineering review, and must comply with the height limits for your zoning district. Unlike a ground-floor addition, a second story changes the roofline and structural load path of your entire home, triggering stricter engineering requirements. In Portland, the height limit for R20 zones is not confirmed (see official source) — verify your zone before planning.

Second Story Addition Rules in Portland

Second Story Addition Rules in Portland: Building permit required: Yes — all second story additions require a permit. Example height limit (R20): not confirmed (see official source). Structural engineering drawings required. Setbacks apply to the full structure height.

Costs & Fees

Contact the local building department for current permit fees. Budget separately for structural engineering.

Next Steps

Next steps for adding a second story in Portland: 1. Hire a structural engineer to assess your existing foundation and framing capacity. 2. Confirm your zone height limit and verify the addition meets all setback requirements. 3. Submit full structural plans and permit application to the local building department. 4. Inspections required at foundation reinforcement, framing, shear panels, and final.

Portland Bureau of Development Services (BDS)

Phone: (503) 823-7300 · Verified July 6, 2026 · Source

Website: https://www.portland.gov/bds

Online Permits: https://www.portland.gov/ppd/permits

Get a zoning answer for your address, checked against the code$49 one-time

We keep the words you type, the address of this page and the date, and nothing else. Please leave out names and contact details.

Source: Portland Bureau of Development Services (BDS) — Building Regulations. Last verified April 5, 2026. View source

Last updated: April 5, 2026
Can I Build a Second Story Addition in Portland, OR? (2026 Rules) | PropertyZoned