Detroit ADU

ADU Rules in Detroit, MI (2026)

ADU rules, permit requirements, size limits, and fees for Detroit, MI. Source-cited from official municipal code.

ADUs Allowed

Yes, ADUs are allowed in Detroit, MI.

Detroit, MI permits accessory dwelling units (ADUs) on residential properties. ADUs — also called granny flats, in-law units, backyard cottages, or secondary suites — are secondary housing units on a single-family or multifamily lot. State and local law governs the approval process. In Detroit, the Detroit Buildings, Safety Engineering and Environmental Department (BSEED) handles ADU permit applications. Below you will find the current size limits, setbacks, fees, and timeline for building an ADU in Detroit.

ADU Size Limits

ADU Size Limits in Detroit: Detached ADU: up to 800 sq ft (max height: 24 feet). Attached ADU: 600 sq ft. Detroit ADU regulations are set locally. Detached ADU (carriage house/garage apartment) limited to approximately 800 sqft. JADU is a California-specific concept — not applicable in Michigan. Detroit's vacant land context means many ADUs are built on previously empty lots adjacent to the primary residence.

TypeMax SizeMax Height
Detached ADU800 sq ft24 feet
Attached ADU600 sq ftPer primary structure zone height

Permit Fees

ADU Permit Fees in Detroit: Plan check fee: $150-$800. Building permit fee: Based on construction value — typically $800-$3,500. Impact fees: None. School fees: None or N/A. Total estimated permit cost: $1,000-$4,500 total permit fees. Detroit BSEED fee schedule. Detroit does not have impact fees. Detroit Renaissance Zone areas may have some fee exemptions. Source: detroitmi.gov/departments/buildings-safety-engineering-and-environmental-department

Fee TypeAmount
Plan Check$150-$800
Building PermitBased on construction value — typically $800-$3,500
Impact FeesNone
School FeesNone
Total Estimate$1,000-$4,500 total permit fees

Permit Timeline

Detroit ADU Permit Timeline: Detroit Buildings, Safety Engineering and Environmental Department (BSEED): ADU permits typically 6-10 weeks for plan review. Construction 3-8 months depending on contractor availability. Detroit's construction labor market has grown with the city's comeback. Apply through the Detroit Buildings, Safety Engineering and Environmental Department (BSEED) online permit portal. Phone: (313) 224-3158.

Setback Requirements

ADU Setback Requirements in Detroit: Front setback: follows zone standard. Side setback: 3 feet. Rear setback: 4 feet. Detroit rear yard setback for accessory structures is typically 4 ft from the rear property line, 3 ft from the side property line. Detroit's standard lot is approximately 30 ft wide by 100 ft deep in most residential neighborhoods. Per Detroit City Code Chapter 61.

Parking Requirements

Parking Requirements: One parking space required per ADU. Detroit's auto-centric legacy means most parcels have a detached garage or paved pad. New ADU construction in converted garages may require a replacement parking space be created elsewhere on the parcel.

Restrictions & Requirements

  • ADU must comply with Detroit Building Code habitability standards
  • Detached ADU limited to rear yard — not permitted in front or side yards
  • Structure must meet minimum 7 ft ceiling height for habitable space
  • All utilities must be properly connected — no unpermitted electrical or plumbing
  • Historic district overlay (Woodbridge, Indian Village, Boston-Edison) may require additional review
  • Detroit Land Bank Authority properties sold for ADU development subject to DLBA deed restrictions

How Many ADUs Are Allowed?

Number of ADUs Allowed in Detroit: Single-family lots: 1 ADU per lot. Multifamily properties: Accessory units on multifamily parcels subject to site plan review. Detroit's shrinking city context creates unique opportunities: some homeowners purchase adjacent vacant DLBA lots to build a standalone ADU on a newly consolidated parcel. This requires lot consolidation through the City of Detroit.

Single-Family Lots

1 ADU per lot

Multifamily Properties

Accessory units on multifamily parcels subject to site plan review

Historic District Considerations

Historic District Requirements: Detroit has 12 historic districts where additional design review may be required for ADU construction. Design review approval is required before obtaining a building permit for properties in historic overlay zones. Detroit Historic District Commission (HDC) designates local historic districts. Notable districts include Boston-Edison Historic District (192 homes), Indian Village, Woodbridge Historic District, West Canfield Historic District, and the Lafayette Park Historic District. Certificate of Appropriateness required for exterior changes to structures in designated districts. Detroit also has National Register Historic Districts including Midtown and Corktown which have federal tax credit implications but less restrictive local review. Look up historic district boundaries at: https://detroitmi.gov/departments/planning-development-department/historic-designation

Frequently Asked Questions

Can I build an ADU in Detroit?

Yes. Detroit, MI allows accessory dwelling units. On a single-family lot you can build 1 ADU per lot.

How big can an ADU be in Detroit?

The maximum size for a detached ADU in Detroit is 800 square feet.

How long does it take to get an ADU permit in Detroit?

The typical ADU permit timeline in Detroit is Detroit Buildings, Safety Engineering and Environmental Department (BSEED): ADU permits typically 6-10 weeks for plan review. Construction 3-8 months depending on contractor availability. Detroit's construction labor market has grown with the city's comeback.. Total estimated permit fees are $1,000-$4,500 total permit fees.

Do I need extra parking for an ADU in Detroit?

No, Detroit does not require additional parking for ADUs.

Do I have to live on-site to have an ADU in Detroit?

No, owner-occupancy is not required for ADUs in Detroit.

Source: Detroit City Code Chapter 61 (Zoning); Detroit BSEED Permit Requirements. Last verified April 6, 2026. View source

Last updated: April 6, 2026
ADU Rules in Detroit, MI (2026) — Requirements & Costs | PropertyZoned