ADU Rules in Santa Monica, CA (2026)
ADU rules, permit requirements, size limits, and fees for Santa Monica, CA. Source-cited from official municipal code.
Yes, ADUs are allowed in Santa Monica, CA.
Santa Monica, CA permits accessory dwelling units (ADUs) on residential properties. ADUs — also called granny flats, in-law units, backyard cottages, or secondary suites — are secondary housing units on a single-family or multifamily lot. California state law actively preempts local restrictions, making ADU approval a streamlined ministerial process. In Santa Monica, the Santa Monica Community Development Department — Building and Safety Division handles ADU permit applications. Below you will find the current size limits, setbacks, fees, and timeline for building an ADU in Santa Monica.
ADU Size Limits
ADU Size Limits in Santa Monica: Detached ADU: up to 1200 sq ft (max height: 16 feet). Attached ADU: 50% of primary dwelling up to 1200 sqft. Junior ADU (JADU): up to 500 sq ft — must be within the existing primary dwelling or accessory structure. Detached ADU maximum 1,200 sqft per California Gov Code 65852.2(c)(2)(B). JADU maximum 500 sqft within existing dwelling per Gov Code 65852.22. Santa Monica's extremely high land values make ADUs for rental income highly lucrative — even a 500 sqft JADU can rent for $2,500+ per month. SMMC Section 9.31.290.
| Type | Max Size | Max Height |
|---|---|---|
| Detached ADU | 1200 sq ft | 16 feet |
| Attached ADU | 50% of primary dwelling up to 1200 sqft | Same as primary dwelling height limit per zone |
| JADU | 500 sq ft | Within existing structure |
Permit Fees
ADU Permit Fees in Santa Monica: Plan check fee: $800–$4,000 depending on project value. Building permit fee: $1,500–$6,000 depending on valuation. Impact fees: None. School fees: Exempt for ADUs under 750 sqft. ADUs 750+ sqft subject to Santa Monica-Malibu Unified School District developer fees.. Total estimated permit cost: $3,000–$12,000 total permit fees — higher than most CA cities due to Santa Monica's premium fee schedule. Impact fees waived for ADUs under 750 sqft per Gov Code 65852.2(f)(3). Santa Monica Water department connection fees for new services. Santa Monica is in the Coastal Zone — Coastal Development Permits required for properties west of Lincoln Blvd and near the beach. CDP review is an additional step and cost. Fee schedule: https://www.santamonica.gov/departments/community-development/building
| Fee Type | Amount |
|---|---|
| Plan Check | $800–$4,000 depending on project value |
| Building Permit | $1,500–$6,000 depending on valuation |
| Impact Fees | None |
| School Fees | Exempt for ADUs under 750 sqft. ADUs 750+ sqft subject to Santa Monica-Malibu Unified School District developer fees. |
| Total Estimate | $3,000–$12,000 total permit fees — higher than most CA cities due to Santa Monica's premium fee schedule |
Permit Timeline
Santa Monica ADU Permit Timeline: Santa Monica Community Development processes ADU permits through SMGovNet online portal. Ministerial approval within 60 days per state law. Plan review typically 4-8 weeks due to high permit volume in this dense city. Construction 4-12 months. Santa Monica's Coastal Zone status for beachside properties adds Coastal Development Permit requirements. Apply through the Santa Monica Community Development Department — Building and Safety Division online permit portal. Phone: (310) 458-8355.
Setback Requirements
ADU Setback Requirements in Santa Monica: Front setback: Same as zone standard. Side setback: 4 feet. Rear setback: 4 feet. 4-foot side and rear setbacks for new detached ADUs per California Gov Code 65852.2(c)(2)(E). Santa Monica's R1 zones typically require 5 ft interior side and 15-20 ft front setbacks for primary dwellings. ADU setbacks at 4 ft are less than primary dwelling standards — state law cannot be restricted locally.
Parking Requirements
Parking Requirements: No additional parking required for ADUs within one-half mile of Metro E Line (Expo Line) stations. Downtown Santa Monica (4th/Colorado), 17th St/SMC, and 26th St/Bergamot stations create broad transit proximity zones. No replacement parking when garage converted to ADU. Per California Gov Code 65852.2(d).
Restrictions & Requirements
- ADU must comply with Santa Monica Municipal Code objective standards — SMMC Chapter 9.31.290
- ADU subject to Santa Monica Rent Control Charter Amendment (RCCA) if it meets RCCA coverage criteria (generally applies to buildings with 2+ units built before 1979)
- Short-term rental of ADU (fewer than 30 days) prohibited under Santa Monica's strict STR ordinance
- ADU in the Coastal Zone west of Lincoln Blvd may require Coastal Development Permit
- ADU cannot be sold separately from primary dwelling
- Historic districts (Wilshire Montana Boulevard Overlay District) may require Design Review
How Many ADUs Are Allowed?
Number of ADUs Allowed in Santa Monica: Single-family lots: 1 ADU + 1 JADU per single-family lot. Multifamily properties: Up to 25% of existing units (minimum 2) as detached ADUs; internal conversions permitted per state law. CRITICAL NOTE: Santa Monica Rent Control (RCCA) may apply to newly created ADUs in certain circumstances. Consult a Santa Monica rent control attorney before creating an ADU if you have existing tenants or multifamily buildings. New ADUs in newly built structures (post-1995) are generally exempt from rent control under Costa-Hawkins.
Single-Family Lots
1 ADU + 1 JADU per single-family lot
Multifamily Properties
Up to 25% of existing units (minimum 2) as detached ADUs; internal conversions permitted per state law
State Law & Preemption
State Preemption: California Government Code Section 65852.2 (AB 68 2019, AB 881 2019, SB 9 2022) preempts local ADU restrictions. Santa Monica must permit ADUs by-right on all residential lots. Owner-occupancy requirement eliminated statewide January 1, 2020. Santa Monica's SMMC Chapter 9.31.290 implements state ADU law — despite local rent control and strict housing regulations, the city cannot override state ADU preemption.
Historic District Considerations
Historic District Requirements: Santa Monica has 4 historic districts where additional design review may be required for ADU construction. Design review approval is required before obtaining a building permit for properties in historic overlay zones. Santa Monica has 4 locally-designated landmark districts: Wilshire Montana Boulevard Neighborhood Historic District, Fourth Street Historic District, and portions of the Ocean Park neighborhood. The Santa Monica Landmarks Commission oversees preservation. Individually-landmarked properties (over 100 in the city) require Certificate of Appropriateness for exterior alterations. The city has a Miramar Hotel historic designation important for that redevelopment project. Look up historic district boundaries at: https://www.santamonica.gov/departments/community-development/planning/landmarks-and-historic-preservation
Frequently Asked Questions
Can I build an ADU in Santa Monica?
Yes. Santa Monica, CA allows accessory dwelling units. On a single-family lot you can build 1 ADU + 1 JADU per single-family lot.
How big can an ADU be in Santa Monica?
The maximum size for a detached ADU in Santa Monica is 1,200 square feet. A Junior ADU (JADU) can be up to 500 square feet.
How long does it take to get an ADU permit in Santa Monica?
The typical ADU permit timeline in Santa Monica is Santa Monica Community Development processes ADU permits through SMGovNet online portal. Ministerial approval within 60 days per state law. Plan review typically 4-8 weeks due to high permit volume in this dense city. Construction 4-12 months. Santa Monica's Coastal Zone status for beachside properties adds Coastal Development Permit requirements.. Total estimated permit fees are $3,000–$12,000 total permit fees — higher than most CA cities due to Santa Monica's premium fee schedule.
Do I need extra parking for an ADU in Santa Monica?
No, Santa Monica does not require additional parking for ADUs.
Do I have to live on-site to have an ADU in Santa Monica?
No, owner-occupancy is not required for ADUs in Santa Monica.
Source: Santa Monica Municipal Code Chapter 9.31.290 — Accessory Dwelling Units; California Government Code Section 65852.2. Last verified April 6, 2026. View source